Boston Harbor
A G+21 development on JP Road beside Azad Nagar metro, with only two apartments per floor across three wings. Five layouts from 784 to 1,013 sq ft RERA carpet.
Artist impressions supplied by the developer. The building is not yet complete and the finished project may differ.
Configurations in this project
| Configuration | RERA carpet | Price | |
|---|---|---|---|
| 2.5 BHK · B wing · B2 unit | 784 sq ft | ₹2.51 cr + charges | Details |
| 3 BHK · A wing · A2 unit | 1,013 sq ft | ₹3.24 cr + charges | Details |
| 3 BHK · B wing · B1 unit | 814 sq ft | ₹2.60 cr + charges | Details |
| 3 BHK · A wing · A1 unit | 908 sq ft | ₹2.90 cr + charges | Details |
About the project
Boston Harbor is a ground-plus-21-storey development on JP Road in Andheri West, immediately beside Azad Nagar metro station, built by Verdent Ventures across roughly half an acre.
The detail that separates it from most towers on this stretch is the density: two apartments per floor. That means a landing shared with one neighbour rather than five, cross-ventilation on both sides of each home, and a lift that is not carrying eight families. On a plot this size in Andheri West, most developers would have fitted four units to a floor.
Three wings run to different heights — A wing from the sixth to the twentieth floor, B wing from the second to the twentieth, C wing from the first to the tenth. Five layouts are offered across them, all quoted on RERA carpet area rather than saleable or built-up, which is the measure that matters when you compare against anything else.
Amenities sit on the roof rather than at podium level: lounge seating, terrace landscaping, a children's play area, an open lawn and multi-purpose zones for football and basketball, alongside a gymnasium and community hall. Parking is a mechanised tower with stilt parking and EV charging points.
Azad Nagar station sits on Metro Line 1, the Versova–Andheri–Ghatkopar corridor, which is what makes this address unusually well connected for Andheri West. From it you reach the Western Railway line at Andheri (Churchgate to Virar), the Central Railway line at Ghatkopar (Mumbai CST to Khopoli and Kasara), Metro Line 2A at D. N. Nagar (D. N. Nagar to Dahisar West), and Metro Line 7 at Andheri (Gundavali to Dahisar East). Four rail corridors from one station, without changing to a road leg first.
Verdent Ventures — registered as Verdent Infra Bultcon — publishes seventeen-plus years in construction, twenty-plus projects delivered across Mumbai, over ten lakh sq ft of upcoming development and forty-plus million sq ft under development. Completed buildings include Vastu Enclave and Sai Sharan in Andheri East, Prabhay Arisha in Chembur, Manibhadra Tower in Mulund West, Prabhay Evana in Andheri West and Amra Kunj CHS in Nashik.
We would suggest visiting one of those delivered buildings before committing to an under-construction one. It tells you more about finish quality, lift specification and how a lobby actually wears than any brochure can.
Amenities
Specifications
What is nearby
| A. H. Wadia High School | 450 m |
| Billabong High International School | 700 m |
| JBCN School | 3.6 km |
| Andheri Sports Complex | 150 m |
| Shri Aadinath Shwetambar Jain Derasar | 270 m |
| Belle Vue Hospital | 1.3 km |
| Kokilaben Hospital | 2 km |
| Andheri railway station | 1.3 km |
| Versova metro station | 1.7 km |
| Jogeshwari metro station | 3.9 km |
| Chhatrapati Shivaji Maharaj International Airport | 8.4 km |
| Apna Bazaar | 1 km |
| Tata and TESCO Star Bazaar | 1.9 km |
| Zudio | 2 km |
| PVR Citi Mall | 2.6 km |
| Infiniti Mall | 2.9 km |
| Satellite – The Club | 900 m |
| Bombay Cocktail Bar | 1.2 km |
| Barrel And Co | 1.5 km |
| Lord of the Drinks Andheri | 2.3 km |
| Yeda Republic | 3.3 km |
Distances as stated by the developer, per Google Maps.
The facts
About 12% complete — excavation 85%, plinth 50%, superstructure not started (MahaRERA, latest filing)
This is the figure the developer files with MahaRERA, not a marketing claim. Weigh it against the possession date before you commit.
Loan calculator
Pre-filled with this project’s entry price. Move the sliders to see what it costs each month.
Indicative only. Stamp duty, registration and GST are not included, and lenders assess eligibility on income and credit history. We can introduce you to lenders at no cost to you.
MahaRERA records the project as roughly 12% complete — excavation 85%, plinth 50%, and the superstructure not yet started — against a stated possession of September 2027. Judge that timeline for yourself. Note also that one listing portal publishes possession as December 2027; the RERA registration says September 2027, and that is the date that binds. Quoted prices exclude stamp duty, registration, GST and society charges. Every image is a developer artist impression. The developer publishes an indicative 4% rental yield; independent portal data for Andheri West puts gross yields nearer 3.6%, and our own reading nearer 3%. Verify P51800079155 yourself at maharera.maharashtra.gov.in, and ask us for the sanctioned plans, the escrow account details and the allotment letter before you pay anything.